• Powder River Energy Corporation Application for Joint Use of Poles

    Powder River Energy Corporation Application for Joint Use of Poles

  • General Information

  •  - -
  • Messenger Cable

  • Attachments and Submit

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please provide additional drawings or maps if necessary to convey the intent of this attachment request.

    • Code clearances must be maintained over all road crossings.
    • All cable attachments must be a minimum of 40" below pole neutral attachments.
    • Unbalanced tension at "riser down" pole must be guyed and spread guys may need to be used because of tightness with existing facilities.

     

    PRECorp will evaluate this request and respond within 10-15 days.

  • Should be Empty: